Skip To

  • Skip to content
  • Jump to navigation
  • Search

Page Outlines

Loading...

    Globe

    IE10 and below are not supported.

    Google Chrome Mozilla Firefox

    Contact us for any help on browser support

    You are here:

    • Home
    • Resources
    Go Back

    Norte-Sur Documents

    Phase 1 (Complete)

    • document icon Survey Responses Report (92.1 KB) (pdf)
    • document icon Tucson Norte-Sur Phase 1 Response to Comments (436 KB) (pdf)
    • document icon Tucson Norte-Sur Study_SWOT Analysis (202 KB) (pdf)
    • document icon Tucson Norte-Sur Phase 1 Final (46.5 MB) (pdf)
    • document icon Tucson ETOD Market Assessment Final Report (24.8 MB) (pdf)

    Phase 2 Documents

    • document icon Tucson Norte-Sur Phase 2 FINAL (24.2 MB) (pdf)
    • document icon Tucson Norte-Sur Executive Summary (81.9 MB) (pdf)
    • document icon Roy Laos Transit Center Facility Review & Recommendations (2.19 MB) (pdf)
    • document icon Tohono Tadai Transit Center Facility Review & Recommendations (2.39 MB) (pdf)
    • document icon South 6th Ave. Road Safety Assessment (19 MB) (pdf)
    • document icon Stone Ave. Road Safety Assessment (2.58 MB) (pdf)
    • document icon Tucson Norte-Sur Sidewalk Connections Pedestrian Access Study (19.6 MB) (pdf)
    • document icon Tucson Bus Rapid Transit Assessment-Economic Development, Demographic, Commuting, and Rent Perspectives (2.94 MB) (pdf)
    • document icon Norte Sur Comment Form (18.1 KB) (xlsx)